A draft of the 2007 WestConnect Planning Report and Transmission Plan has been posted on the WestConnect Website for review and comment. The review and comment period will last two weeks, until December 18, 2007.
Received Comments and Responses on Draft Reports
Draft WestConnect Planning Report (35 KB) – Comments and responses on the WestConnect Planning Report.
Draft WestConnect Transmission Plan Report (35 KB) – Comments and responses on the WestConnect Transmission Plan Report.
Segmentation of the Report for Review
The size of the documents has prompted the segmentation of the reports for the review process. Submittal of comments on individual segments is encouraged prior to the deadline.
Below are hyperlinks to download the appropriate sections of the report along with a brief description of the document:
Support Documents
WestConnect Planning Report Segments
- Introduction (2.5 MB) - The front page, table of contents and summary
- Section 2 (3.0 MB) - Discussion of subregional planning processes
- Section 3 (4.7 MB) - Discussion of project information
- Section 4 (2.7 MB) - Discussion of public policy
- Section 5 (2.0 MB) - Discussion of subregional study activities
- Section 6 (45 KB) - Discussion of 2008 subregional study plans
- Section 7 (1.2 MB) – Exhibits I and II
- Section 8 (1.6 MB) - Exhibits III and IV
Complete Draft WestConnect Planning Report (for viewing only (2.7 MB))
WestConnect Transmission Plan Segments
- Introduction Segment 1 (500 KB) - The front page, table of contents and body of the report.
- Exhibits Segment 2 (2.2 MB) - Sorted tables and overview maps
- Exhibits Segment 3 (3.9 MB) – Additional overview maps
- Appendix Segment 4 (5.1 MB) - Summary, Maps and Forms for APS, Basin Electric, Black Hills and Colorado Springs Utilities
- Appendix Segment 5 (3.5 MB) - Summary, Maps and Forms for Dine Navajo Project and El Paso Electric
- Appendix Segment 6 (3.4 MB) - Summary, Maps and Forms for Platts River #1
- Appendix Segment 7 (3.4 MB) - Summary, Maps and Forms for Platts River #2
- Appendix Segment 8 (400 KB) – Summary, Maps and Forms for Public Service Company of Colorado and Public Service Company of New Mexico
- Appendix Segment 9 (3.0 MB) - Summary, Maps for Salt River Project #1
- Appendix Segment 10 (3.1 MB) - Maps and Forms for Salt River Project #2 and Sacramento Municipal Utility District
- Appendix Segment 11 (3.3 MB) - Summary, Maps and Forms for Sierra Pacific Power Company/Nevada Power Company and Southwest Transmission Coop
- Appendix Segment 12 (5.7 MB) - Summary, Maps and Forms for SunZia and Tri-State
- Appendix Segment 13 (1.4 MB) - Summary, Maps and Forms for Tucson Electric Power and UniSource Energy Services
- Appendix Segment 14 (3.5 MB) - Summary, Maps and Forms for WAPA DSR/SNR/RMR and Wyoming-Colorado Intertie Project
- Appendix Segment 15 (2.0 MB) - Summary, Maps Conceptual Projects #1
- Appendix Segment 16 (3.9 MB) - Summary, Maps Conceptual Projects #2
- Appendix Segment 17 (3.8 MB) - Summary, Maps Conceptual Projects #3
- Appendix Segment 18 (4.0 MB) - Summary, Maps Conceptual Projects #4
Complete Draft WestConnect Transmission Plan ((for viewing only (10.1 MB))
Draft Report Review Process
Please follow the described review process to help ensure a prompt and accurate final product:
- Download and save the documents you are planning on reviewing.
- Ensure “Track Changes” is enabled (Tools > Track Changes).
- Make appropriate changes to the document, then save
- Submit the reviewed document to westconnect@krsaline.com
- **Please only send one reviewed document at a time to the email address to ensure receipt – a received document email will be sent**
- If required, submit additional support document emails. (for items such as maps, reports, etc)
Contact Information for Review Questions
KRSA’s preferred method of contact is through the WestConnect informational email address westconnect@krsaline.com. Most general review questions can be handled through this email account. Additional email contacts include:
Completed WestConnect Ten-Year Transmission Plan Project Forms should be returned to Christopher M. Fecke-Stoudt.
Additional K.R. Saline and Associates, PLC contact information:
Phone: 480-610-8741
Fax: 480-610-8796
Address: 610 North Pasadena Drive, Suite 101,
Mesa, Arizona,
85201-6764
|